A lightning event at a data centre doesn't just damage equipment — it threatens the availability guarantees that underpin every client contract and SLA. A single surge propagating through inadequately protected power distribution can cascade across PDUs, UPS systems, and IT loads in milliseconds.
Aetheric designs protection and earthing systems purpose-built for data centre environments — high-density electronic loads, complex power distribution, and zero-tolerance downtime.
The Data Centre Lightning Challenge
Power Distribution Complexity
- Multi-stage distribution from utility intake through transformers, UPS, PDUs, and rack-level
- Coordinated SPDs (Type 1/2/3) at every stage to prevent cascading surge damage
- Proper energy coordination between protection stages
Telecommunications Exposure
- Fibre, copper, and wireless service entrances as surge ingress points
- Protection extending to carrier interconnects, inter-building links, and management networks
Equipotential Bonding & Signal Reference
- Low-impedance bonding network and signal reference grid for IT equipment
- Earthing verification confirming bonding meets AS/NZS 3000 requirements
Cooling & Mechanical Systems
- Rooftop HVAC and cooling tower protection via RSM analysis
- SPD protection for variable speed drives and BMS control systems
How We Help
Our data centre services span the full protection lifecycle:
- Risk assessment — quantify exposure and justify protection investments against downtime costs
- LPS design — integrated external and internal protection for the complete facility
- SPD coordination — multi-stage surge protection across power and telecom distribution
- Earthing testing — bonding network and signal reference grid verification
- Site audits — independent assessment of existing protection adequacy
- RaaS — ongoing monitoring and compliance verification
Standards
IEC 62305Protection Against Lightning
AS/NZS 1768:2021Lightning Protection
AS/NZS 3000Electrical Installations
EN 50600Data Centre Facilities